© Alpha Engineering & Construction Ltd. All rights reserved. Created By: KMRSCloud


Construction of the extension of a Distribution Centre in the production facility located at Churchill Roosevelt Highway, Valsayn, Warehouse. A breakdown of the approximate square foot of the site is listed below:
• Warehouse -22,884 sq. ft.
• Driver’s Rest -495 sq. ft.
• Fork Lift -2,934 sq. ft.
• Warehouse Offices (First Floor) - 995.7 sq. ft.
• Warehouse Offices (Second) - 995.7 sq. ft.
NESTLE TRINIDAD & TOBAGO LTD
CHURCHILL ROOSEVELT HIGHWAY VALSAYN, TRINIDAD
AUGUST 2010 - JUNE 2011

Mon - Fri: 8 am - 5 pm
Sat & Sun: CLOSED
© Alpha Engineering & Construction Ltd. All rights reserved. Created By: KMRSCloud